360) A Soldering Operation Was Work-sampled Over Two Days (16 Hours) During Which An Employee Soldered 108 Joints. Actual Working Time Was 90% Of The Total Time And The Performance Rating Was Estimated To Be 120 Percent. If The Contract Provides Allowance Of 20 Percent Of The Total Time Available, The Standard Time For The Operation Would Be
8 Min
8.9 Min
10 Min
12 Min
Hint
No Hint Found
Previous | Medium (Difficulty Level)| Next
Previous | Mechanical ( Category) | Next
Previous | Date Wise (As Submitted)| Next
This is Medium Level Question in English Language Posted By Sunil Saharan in Engineering --> Mechanical Category (Viewed : 76 Times)

इस बात को व्यक्त मत होने दीजिये कि आपने क्या करने के लिए सोचा है, बुद्धिमानी से इसे रहस्य बनाये रखिये और इस काम को करने के लिए दृढ रहिये।

Do Not Let This Thing Be Expressed That What You Have Thought To Do, Keep It Secret By Wisely And Be Firm For Doing This Work.

-- Chanakya
Site Statistics
Stats at a Glance

Articles: 54
Viewed: 391999 Times
Photos : 53
Viewed: 576265 Times
Questions : 2344
Viewed: 202983 Times
Page Load No. 3172929

Articles
Photos
Take Quiz
1 Liners For Exam
Show Questions(1 by 1)
 ©2011-2023 SunilSaharan.In